Coach House is the UK’s largest wholesale and trade-only furniture and giftware supplier. The family-run business has operated from its 300,000 sq ft sales, warehouse and distribution facility in Altham, Lancashire, since 2004.
Coach House wanted to optimise operations within its existing site to improve customer service quality, and identified the need to extend its footprint by a further 100,000 sq ft, targeting build completion by December 2016. The company engaged The Supply Chain Consulting Group (SCCG) to manage the integrated warehouse stock management and workflow processes behind its distribution operation.
Coach House needed to keep improving service levels and controlling costs within its current 300,000 sq ft site, while simultaneously planning for a 100,000 sq ft extension, without disrupting day-to-day operations or losing control of stockholding and distribution costs during the transition.
SCCG’s specialist supply chain and logistics consultants carried out an initial onsite review of current operations and future requirements to make sure layouts, workflows and designs were optimised to their full potential. Working closely with the Coach House management team, the consultants defined optimised picking strategies, shift patterns, resource plans and warehouse management team structures to build an operating model for current and future warehousing needs.
This was followed by a capacity assessment of the optimised facility against current and future growth requirements, leading to recommendations for improving productivity and capacity, along with suggested KPI metrics for core activities such as similar-item and case-pick operations.
After completing this initial review, Coach House asked SCCG to extend the project scope, commissioning a further operational review covering product flows and volumes, picking, packing and despatch procedures, and inventory management. The consultants provided CAD drawings of rack and equipment layouts and defined work areas, and ran a capacity assessment of the optimised facility, covering both the existing site and the proposed extension, over the full planning horizon.
Implementing the project plan helped Coach House meet and exceed customer delivery and service expectations, positioned the site to support current and future growth with a cost-effective operating model, and gave the business tighter control over stockholding and distribution costs. The extended scope of work delivered a final set of recommendations and an implementation plan covering both the existing 300,000 sq ft facility and its 100,000 sq ft extension.
By combining a detailed operational review with capacity planning across both the existing site and its extension, SCCG gave Coach House a best-fit solution for its current warehouse footprint and its in-build expansion, optimising operations while ensuring the smoothest possible transition into the combined facility.
Talk to our warehouse optimisation consultants about planning your own facility expansion.